Painters started on Friday and by the looks of these photos from the outside, they've been up to quite a lot since then.
Internal access door from garage taped and painting has started. |
Front Door all taped and ready for painting. |
Kitchen splash back window and cabinetry all protected :) |
Stairwell window (3m high) and Monument Down pipe on the right... |
New location of the gas meter (top left) vs old location (bottom right)! |
Lookin' gooooood
Kirst
Yay painting! And congrats on getting the gas meter moved. Must be a relief :)
ReplyDeleteHi Kirsten (just stopping by after your comment on my blog!). Have had a look through and I looooove your kitchen!
ReplyDelete