Monday, April 2, 2012

Colour our world!

Well, in boring white undercoat that is!




Painters started on Friday and by the looks of these photos from the outside, they've been up to quite a lot since then.


Internal access door from garage taped and painting has started.

Front Door all taped and ready for painting.


Kitchen splash back window and cabinetry all protected :)

Stairwell window (3m high) and Monument Down pipe on the right...

New location of the gas meter (top left) vs old location (bottom right)!


Lookin' gooooood


Kirst

2 comments:

  1. Yay painting! And congrats on getting the gas meter moved. Must be a relief :)

    ReplyDelete
  2. Hi Kirsten (just stopping by after your comment on my blog!). Have had a look through and I looooove your kitchen!

    ReplyDelete

We love to hear your thoughts or answer your questions...